Supplier Risk is anything on the supply side that could stop you, slow you down, or hurt your quality. Supplier risk management means finding those risks early, ranking them, and putting the right controls on the right suppliers, before the phone rings at six in the morning.

9:56 · Q-Bot · narrated, with worked example and a check-yourself question

In short

Check yourself. A part costs very little each year, but only one company in the world can make it. In the Kral-yitch portfolio model, which kind of item is it? A, strategic. B, leverage. C, bottleneck. D, non-critical. Pause the video if you want to think about it. The answer is C, bottleneck! Low impact on profit, but hard to replace. Secure the supply, keep some extra stock, and look for an alternative. Picked D? Non-critical means low impact and easy to replace. One supplier in the whole world is anything but easy.

Check yourself

That's supplier risk. Questions? Ask Q-Bot right here in the Academy. Why did Ellen turn down the broker's cheap tubing? It was a hollow promise!

Show the answer

Where this topic is taught

This lesson is part of every free Academy course whose Body of Knowledge covers it. Each course puts it in context, with exercises and checks.

Full lesson transcript

The narration from the video, by chapter. Brindlewood Outdoor Furniture and its people are a fictional company used in every Q-Bot Academy lesson.

Intro

Brindlewood, Monday morning. Ellen's phone rings at six. A storm knocked out the power at the aluminum tube mill, the only mill that makes Brindlewood's chair tubing. They'll be down for two weeks. Lou checks the racks: four days of tubing. Rosa asks the big question. What does this cost us? Then a broker calls Ellen. Same tubing, ships tomorrow, a little cheaper. Ellen looks at the paperwork, and frowns.

Hey there, I'm Q-Bot. Welcome to the Q-Bot Academy. Today: supplier risk! We'll find and sort the risks, sort the suppliers too, rank what could go wrong, plan for the bad day, keep fake parts out, and check that the plan really works.

What it is

So, what is supplier risk? It's anything on the supply side that could stop you, slow you down, or hurt your quality. Supplier risk management means finding those risks early, ranking them, and putting the right controls on the right suppliers, before the phone rings at six in the morning.

Why it matters

Why does it matter? You can't inspect your way out of an empty rack. When a key supplier stops, your line stops, and your customers don't care whose fault it was. And not every supplier deserves the same attention. Spread your effort evenly, and you'll check the screws as hard as the tubing. Risk tells you where to look first.

How it works

Now, how it works. Step one: identify the risks, and sort them into categories, so nothing gets missed. Organizational: new owners, or a key person leaving. Business: money trouble, one plant, no spare capacity. Security: theft, hacking, counterfeits. Product: the part itself, out of spec. Bad: a list of whatever people happen to remember. Good: every key supplier checked against all four!

Then sort the suppliers themselves. The Kral-yitch portfolio model asks two questions. How much does this purchase affect our profit? And how hard would it be to replace? High and high: strategic. Work closely together, and always have a plan B. High impact, easy to replace: leverage. Shop around. Low impact, hard to replace: bottleneck. Secure the supply, and look for alternatives. Low and low: non-critical. Keep it simple and cheap.

Step two: analyze and rank. Decision analysis compares your options by cost and chance. A supplier F M E A lists how things could fail, and rates severity, occurrence and detection. A fault tree works backward from the bad event, through and gates and or gates, to its causes. And a process audit at the supplier checks that what they say is what they do. Bad: ranking by gut feel. Good: ranking with a tool the whole team can check!

Step three: plan for the bad day, and control the risk. Business continuity is how you keep shipping when something breaks. A contingency plan is plan B, written down before you need it. Resilience means one hit can't knock you over: extra stock, or a second qualified source. Then a risk mitigation plan says how you'll predict, minimize, monitor and control each big risk, with inspection and test plans for incoming material. Bad: the same checks for everything. Good: plan B written down, and the tightest checks where the risk is highest!

Step four: keep out counterfeits. Fake or misrepresented parts, materials and services sneak in when supply is tight and someone offers a fast deal. Four strategies. Map the supply chain, so you know where the real thing comes from. Avoid risky sources: buy from the maker, or its authorized distributors. Detect: check certificates with the maker, check lot numbers, and test. And mitigate: if you find one, quarantine it, report it, and never send it back into the market.

Step five: check that it works. Use plan, do, check, act. Did the controls catch what they should? Did plan B work when it was needed? Product audits check finished goods against the spec, and kanban keeps safety stock visible. Bad: a plan written once and filed away. Good: a plan reviewed and improved, on a schedule!

Let's work it at Brindlewood. The tube mill will be down ten working days. Brindlewood has four days of tubing. Ten minus four: six days with no Harbor chairs. At three hundred sixty chairs a day, that's two thousand one hundred sixty chairs. At about thirty dollars of margin a chair, Rosa's answer is sixty four thousand eight hundred dollars, plus a lot of unhappy dealers.

Worked example: the storm

Then the broker. The paperwork looks like a mill certificate, but Ellen calls the mill. That heat number? Not one of theirs. Priya tests a sample tube anyway, and it's softer than the spec. A soft leg could bend under someone! Ellen says no, and reports the offer. Instead, she calls the mill's authorized distributor, who finds three days of real tubing. Six short days become three, and the cost drops to thirty two thousand four hundred dollars.

After the storm, Ellen sorts the supply base. Aluminum tubing: big spend, one mill. Strategic. Shipping cartons: big spend, plenty of box makers. Leverage. Glides: small spend, but only one approved maker since the new selection. Bottleneck. Screws and shop gloves: non-critical. Two of the four need a plan B, and the tube mill is first in line.

Ellen and Marcus run a supplier F M E A for the tube mill. Mill shutdown: severity nine, occurrence two, detection eight. That's an R P N of one hundred forty four. Wrong alloy or a false certificate: nine, two and seven. One hundred twenty six. Thin tube wall: eight, three and four. Ninety six. Shutdown goes to the top of the list. A process audit at the mill confirms their wall checks are solid.

Now a small fault tree. Top event: the Harbor line stops for lack of tubing. Under it, an and gate: the mill is down longer than our stock lasts, and there's no other source. Ellen estimates a ten percent chance a year of a long shutdown. Now qualify a second mill, in another region, with a five percent chance of its own. Both have to fail together: point one times point oh five is half a percent. Once in two hundred years, instead of once in ten! That only works if one storm can't hit both.

So here's the mitigation plan. Safety stock goes from four days to ten. That's six more days, times three hundred sixty chairs, times eight dollars of tubing a chair: seventeen thousand two hundred eighty dollars more on the rack. Marcus qualifies a second mill over six months. And the inspection and test plan for tubing tightens up: every lot's certificate is checked against the heat number, and Priya measures the wall on five tubes a lot. The screws? A quick count and a look.

Six months later, check and act. In April, the first mill's furnace goes down for five days. The ten days on the rack cover it, and the second mill ships the next order. Brindlewood doesn't miss a single chair! Ellen reviews the plan every quarter, and the glides are next.

Common mistakes. Treating every supplier the same. Thinking only about quality, and forgetting money, plants and security. Buying from a broker in a panic. Trusting a certificate without checking it with the maker. Writing a plan B that nobody has tested. And never checking whether the controls really work.

Common mistakes

Let's recap. Identify supplier risks in all four categories: organizational, business, security and product. Sort suppliers by profit impact and how hard they are to replace. Rank the risks with decision analysis, F M E A, fault trees and process audits. Plan for continuity, and match your controls to the risk. Keep counterfeits out: map, avoid, detect and mitigate. And check that the plan really works.

Recap

Check yourself. A part costs very little each year, but only one company in the world can make it. In the Kral-yitch portfolio model, which kind of item is it? A, strategic. B, leverage. C, bottleneck. D, non-critical. Pause the video if you want to think about it.

The answer is C, bottleneck! Low impact on profit, but hard to replace. Secure the supply, keep some extra stock, and look for an alternative. Picked D? Non-critical means low impact and easy to replace. One supplier in the whole world is anything but easy.

Check yourself

That's supplier risk. Questions? Ask Q-Bot right here in the Academy. Why did Ellen turn down the broker's cheap tubing? It was a hollow promise!

Independent study material; not affiliated with or endorsed by ASQ. Body of Knowledge codes identify where the topic appears in each certification's published outline.