Check · Test yourselfPractice tests

Academy › Topic library › Kaizen and the Kaizen Blitz

Q-BOT ACADEMY · FREE VIDEO LESSON · 9 MIN

Kaizen and the Kaizen Blitz

Kaizen is a Japanese word that means change for the better. In quality, it means continuous improvement in small steps, by everyone, every day. Not one giant leap, but hundreds of little ones. A kaizen blitz, also called a kaizen event or a rapid improvement event, is different. It's a short, focused burst: a small team takes one process area and improves it in about three to five days, and the changes are made during that week, not just written down.

8:55 · Q-Bot · narrated, with worked example and a check-yourself question

In short

Kaizen means change for the better: small improvements, by everyone, every day. A kaizen blitz is a focused three to five day event on one area, with changes made that week. Plan it before, with a tight scope, baseline data, and the right team. Run it during the week: see, try, measure, standardize, report out. And after, finish the action list and check at thirty days.

Check yourself

Which problem is the best fit for a kaizen blitz? A, a packer notices a label is hard to read. B, the packing station's layout causes long walks and piles of boxes, and the causes are easy to see. C, coating thickness changes from week to week, and nobody knows why. Or D, rewriting the company's five year strategy.

Show the answer

The answer is B. It's one area, the waste is visible, and a team can fix it in a week. A is a small fix the packer can make today, with everyday kaizen. C has an unknown cause and needs data analysis, so it calls for a full improvement project. And D isn't a process area at all. That's kaizen and the kaizen blitz. Questions? Ask Q-Bot right here in the Academy. And here's one for the road: why did the turning fixture get a standing ovation? Because it finally turned things around!

Where this topic is taught

This lesson is part of every free Academy course whose Body of Knowledge covers it. Each course puts it in context, with exercises and checks.

Full lesson transcript

The narration from the video, by chapter. Brindlewood Outdoor Furniture and its people are a fictional company used in every Q-Bot Academy lesson.

Intro

It's Monday morning at Brindlewood Outdoor Furniture, and Dwayne is watching Gloria build a Ridge bench. She walks to the far wall for slats. She walks back for bolts, from three different bins. She hunts for a charged drill battery. Then she flips the heavy bench over, twice. Thirty two minutes for one bench! Dwayne sighs. We've always done it this way. Marcus smiles. Then let's give it one week.

Hey there, I'm Q-Bot. Welcome to the Q-Bot Academy. Today: kaizen and the kaizen blitz. We'll cover what kaizen means, how everyday kaizen works, how a one week kaizen blitz runs from start to finish, and when to use each one. Then we'll follow Brindlewood's blitz, with real numbers.

What it is

So, what is it? Kaizen is a Japanese word that means change for the better. In quality, it means continuous improvement in small steps, by everyone, every day. Not one giant leap, but hundreds of little ones. A kaizen blitz, also called a kaizen event or a rapid improvement event, is different. It's a short, focused burst: a small team takes one process area and improves it in about three to five days, and the changes are made during that week, not just written down.

Why it matters

Why does it matter? Because waste hides in plain sight. When a job has always been done one way, nobody sees the walking, the searching, and the waiting anymore. Small problems pile up until the process is slow, tiring, and expensive. Kaizen gives people permission, and a habit, to fix those things. And a blitz gives a stuck area a fast, visible win that the whole plant can see!

How it works: everyday kaizen

Let's start with everyday kaizen. The people who do the work spot a small problem, try a small fix, check it, and keep it if it works. That's a mini Plan, Do, Check, Act. At Brindlewood, Dwayne's crew posts ideas on a board at their huddle. Bad: save ideas for a suggestion box that's opened once a year. Good: a small fix tried this week, with an answer for every idea, even when it's not yet!

Everyday kaizen runs on a few simple rules. Start with what you have, and spend ideas before money. Go and see the work where it happens. Fix the process, not the person. And make every gain the new standard, so the next improvement starts from a higher step. Bad: a clever fix that lives in one person's head. Good: a fix written into the standard work, so every shift does it the same way.

How it works: the kaizen blitz

Now the kaizen blitz. It has three parts: before, during, and after. Before the week, pick one area and set a tight scope, with clear goals and a sponsor. Collect baseline data, so you can prove the change. Bad: improve the whole plant in a week. Good: the Ridge bench assembly station, from parts at the station to a finished bench, with goals for minutes per bench and walking distance.

Next, choose the team. Six to eight people, full time for the week. Include the people who do the job every day, a lead or supervisor, someone from maintenance who can build things on the spot, and one or two fresh eyes from outside the area, who ask the obvious questions. Bad: engineers redesign the station over the weekend while the operators are home. Good: the operators help design it, so they own it!

During the week, a typical plan goes like this. Day one: learn the basics of waste, then go see the current process and time it. Day two: find the waste and its causes. Day three: try changes right on the floor, move things, build simple tools. Day four: test again, fine tune, and write the new standard work. Day five: report out to leaders, on the floor, with before and after numbers. Try, measure, adjust. Nobody waits for a perfect plan!

After the week comes the part that teams forget. Some items won't be finished by Friday, so they go on an open action list, sometimes called a kaizen newspaper, with an owner and a date for each. Then check the numbers at thirty days. Bad: celebrate on Friday, and three weeks later everything's back where it was. Good: a thirty day follow up, and the new standard is still holding!

So when do you use which? Everyday kaizen is for small problems with clear fixes that people can make themselves, for very little money. A kaizen blitz fits one area with obvious waste, where the causes are mostly visible and a team can fix them in a week. But if the cause is unknown, or the problem crosses many areas and needs real data analysis, a blitz is too fast. Use a full improvement project instead, like a Six Sigma project.

Worked example: the Ridge bench blitz

Now, Brindlewood's blitz. Brindlewood builds about a hundred and twenty Ridge benches a week, one assembler per shift. Before the event, Priya timed ten benches. They averaged thirty two minutes each. Only eighteen of those minutes were real assembly: putting slats and bolts on. The other fourteen were walking, searching, and flipping the bench. Gloria walked about four hundred and twenty feet per bench, and fourteen half built benches waited around the station.

The team was Marcus as the facilitator, Dwayne, Gloria and the second shift assembler, Lou, Priya, and Hannah from customer service as the fresh eyes. On day three they moved a slat cart right to the station. Ellen arranged for every bench's bolts to arrive in one pre counted hardware bag, and a second battery stays on the charger at the bench. And Lou built a turning fixture, so the bench rotates instead of being flipped by hand!

On Friday, the report out. Thirty two minutes became twenty two, about thirty one percent less. Walking fell from four hundred and twenty feet to about sixty. Half built benches went from fourteen to four. At a hundred and twenty benches a week, that's twelve hundred minutes saved: twenty hours a week. The real assembly time was still eighteen minutes, but it went from about fifty six percent of the job to about eighty two percent!

Three items went on the action list: a second turning fixture, Lou, two weeks; a floor mark for the slat cart, Gloria, Monday; and new standard work photos, Dwayne, one week. At the thirty day check, the station averaged twenty two to twenty three minutes. The freed hours now help Harbor table assembly. And Gloria? She posted four more ideas on the board, because now she sees the waste everywhere!

Common mistakes

A few common mistakes. One: a scope that's far too big for one week. Two: no baseline data, so nobody can prove what changed. Three: a team without the people who do the work. Four: no follow up, so the area slides back. And five: treating kaizen as a once a year event, instead of a daily habit.

Recap

Let's recap. Kaizen means change for the better: small improvements, by everyone, every day. A kaizen blitz is a focused three to five day event on one area, with changes made that week. Plan it before, with a tight scope, baseline data, and the right team. Run it during the week: see, try, measure, standardize, report out. And after, finish the action list and check at thirty days.

Check yourself

Now, check yourself. Which problem is the best fit for a kaizen blitz? A, a packer notices a label is hard to read. B, the packing station's layout causes long walks and piles of boxes, and the causes are easy to see. C, coating thickness changes from week to week, and nobody knows why. Or D, rewriting the company's five year strategy. Pause the video if you want to think about it.

The answer is B. It's one area, the waste is visible, and a team can fix it in a week. A is a small fix the packer can make today, with everyday kaizen. C has an unknown cause and needs data analysis, so it calls for a full improvement project. And D isn't a process area at all.

That's kaizen and the kaizen blitz. Questions? Ask Q-Bot right here in the Academy. And here's one for the road: why did the turning fixture get a standing ovation? Because it finally turned things around!

Independent study material; not affiliated with or endorsed by ASQ. Body of Knowledge codes identify where the topic appears in each certification's published outline.