Check · Test yourselfPractice tests

Academy › Topic library › Going Deeper: Run Rules, Rational Subgroups and Short-Run SPC

Q-BOT ACADEMY · FREE VIDEO LESSON · 13 MIN

Going Deeper: Run Rules, Rational Subgroups and Short-Run SPC

A control chart is a signal detector. One point beyond three sigma catches a big shift fast, but a small shift can hide inside the limits for a long time. Run rules catch it sooner. And the subgroups decide what the chart can see at all. Pick them badly, and no rule will help you.

13:10 · Q-Bot · narrated, with worked example and a check-yourself question

In short

The tool is the deviation from nominal chart. For every piece, plot its measurement minus that part's nominal. A four hundred fifty point oh three chair leg plots as plus point oh three. A seven hundred nine point nine six table leg plots as minus point oh four. Now every batch lands on one chart. It works when the parts share the same process and about the same spread, and nominal is the target. Check that first!

Check yourself

When the spreads differ, use a standardized chart. Z equals the measurement minus the part's target, divided by that part's own sigma. The limits are plus and minus three, and the zone rules work as usual. Take a deviation of plus point one eight millimeter. On a part with a sigma of point oh six, that's a Z of three, right at the limit. With a sigma of point one two, it's only one point five.

Show the answer

Worked example three. Marcus checks that the three legs have about the same spread: standard deviations of about point oh four to point oh five millimeter. Good. Kofi measures one leg from the middle of every batch on the saw's digital gauge, which already reads the deviation from its setting master. Sixteen batches average about plus point oh one, with a moving range bar of point oh seven five. The limits are the average, plus or minus two point six six times point oh seven five: about minus point one nine to plus point two one millimeter. The moving range limit is about point two five. Batch nineteen is Harbor table legs, and its middle leg reads plus point three one. Above the upper limit of point two one, with a moving range of point three four, above point two five. Signal! Still inside the half millimeter tolerance, but special. After the changeover, the stop's lock lever wasn't fully tightened, and the stop crept. Kofi adds lock and tug to the changeover checklist. On a chart of table legs alone, that batch would have been the only point. No chart at all! One more short run tool: pre control. It's not a control chart. It uses the specification. For a leg of four fifty, plus or minus point five, the middle half of the tolerance is green. The outer quarters are yellow, and outside the spec is red. Start with five greens in a row. Then check two pieces now and then. Two yellows on the same side: adjust. On opposite sides: stop and find out why. Any red: stop. Simple, but it only works well when capability is already good. So how do you read the result and decide? Note which rule fired. One point beyond three sigma points to a sudden change. Runs and four of five point to a small shift. Trends point to wear. Hugging and mixtures point to your subgroups, not your process. Find the cause, fix it, and note it on the chart. And control limits are not specification limits. A signal while every part is in spec is the cheapest time to act! Common mistakes. One: every rule turned on, then chasing false alarms. Two: celebrating a chart that hugs the center line. Three: subgroups that mix machines, heads or shifts. Four: subgroups spread across a whole shift. Five: a deviation from nominal chart for parts with very different spreads. Six: treating pre control as a control chart. Let's recap. Zones: C within one sigma, B from one to two, A from two to three. The four zone rules: one beyond three, two of three beyond two, four of five beyond one, eight in a row on one side. More rules, more false alarms: about one in three seventy points for rule one, about one in ninety for all four. Rational subgroups: within is common cause, between is where signals show. Short runs: chart deviation from nominal, or standardize! Now, check yourself. Lou's oven temperature is on an individuals chart: center line four hundred point oh degrees, upper limit four hundred six point four. The last three mornings read four hundred four point nine, four hundred one point two, and four hundred four point six. Which rule fires? A, none. Every point is inside the limits. B, rule one. C, rule two, two of three beyond two sigma. Or D, rule four. Pause the video if you want to think about it. The answer is C. One sigma is six point four divided by three: about two point one three. So the two sigma line is four hundred four point two seven. Four hundred four point nine and four hundred four point six are both above it, on the same side, within three points. Rule two fires! A forgets that a chart can signal inside its limits. B needs a point beyond four hundred six point four. D needs eight in a row. That's run rules, rational subgroups and short run S P C. Questions? Ask Q-Bot right here in the Academy. And one for the road: why did the bender chart hug the center line? It was trying to keep its two heads together!

Where this topic is taught

This lesson is part of every free Academy course whose Body of Knowledge covers it. Each course puts it in context, with exercises and checks.

Full lesson transcript

The narration from the video, by chapter. Brindlewood Outdoor Furniture and its people are a fictional company used in every Q-Bot Academy lesson.

Intro

Brindlewood, Tuesday morning. Dwayne is staring at the X bar chart for slat mill one. No point is outside the limits, but the last five averages are all sitting high. At the bender, Nate's new chart looks perfect: every point hugs the center line. Too perfect? And in the saw cell, Kofi cuts chair, bench and table legs in short batches, so he never gets twenty subgroups of one part. Three charts, three questions!

Hey there, I'm Q-Bot. Welcome to the Q-Bot Academy. Today we're going deeper: run rules, rational subgroups and short run S P C! We'll learn the zone rules and what each one costs, how to pick subgroups so the chart can see, and how to chart short runs. If control charts are new to you, start with the control charts, the basics video.

Zones and run rules

Why does this matter? A control chart is a signal detector. One point beyond three sigma catches a big shift fast, but a small shift can hide inside the limits for a long time. Run rules catch it sooner. And the subgroups decide what the chart can see at all. Pick them badly, and no rule will help you.

Let's start with the zones. Split the space between the center line and each limit into three equal bands. For an X bar chart, one sigma is the distance from the center line to the limit, divided by three. Zone C is within one sigma of the center. Zone B is from one to two sigma. Zone A is from two to three sigma.

Now the four classic zone rules. Rule one: one point beyond three sigma. Rule two: two out of three points in a row beyond two sigma, on the same side. Rule three: four out of five points in a row beyond one sigma, on the same side. Rule four: eight points in a row on the same side of the center line. Each pattern is unlikely when only common cause is at work, so each one is a signal to go look!

Worked example 1: slat mill one

An extended set adds four more. Six points in a row, all going up or all going down: a trend, like tool wear. Fourteen in a row alternating up and down: often two streams taking turns. Fifteen in a row inside zone C: hugging the center line. And eight in a row with none in zone C: a mixture of two processes. Yes, a chart can signal by being too quiet!

But every rule has a price: false alarms. With a stable process and normal data, the chance of one point beyond three sigma is about point two seven percent. In a spreadsheet, that's two times one minus NORM dot S dot DIST of three. So rule one alone gives a false alarm about once every three hundred seventy points. All four zone rules: about once every ninety. So choose your rules before you look, write them in the control plan, and don't stack every rule on every chart.

Rational subgroups

Worked example one: slat mill one. The center line is nineteen point oh oh millimeters and the upper limit is nineteen point one oh. So one sigma for the averages is point one oh divided by three: about point oh three three. The one sigma line is nineteen point oh three three, and the two sigma line is nineteen point oh six seven. Now the last eight averages: nineteen point oh one, eighteen point nine eight, then point oh two, point oh four, point oh five, point oh two, point oh six, and point oh four.

Worked example 2: the bender

No point is above the upper limit, so rule one stays quiet. No point is beyond the two sigma line, so rule two does too. But the last five: point oh four, point oh five, point oh two, point oh six, point oh four. Four of the five are above nineteen point oh three three. Rule three fires! The mean has crept up about point oh four millimeter, one point two sigma of the averages. Rule one alone would take about twenty eight subgroups, on average, to catch that. With the four rules, about seven.

Ray and Lou go look. The out feed roller's spring has gone weak, so each slat lifts a hair as it leaves the cutter. Every slat is still in spec, but the process has moved. Lou replaces the spring and adds a spring check to the mill's maintenance list. The averages come back to nineteen point oh oh. Caught early, while it was cheap!

Short-run SPC

Now rational subgroups. A rational subgroup is a small set of units made under essentially the same conditions: the same machine, the same setup, close together in time. Variation within a subgroup should be common cause only, and the limits are built from it. Then special causes show up as differences between subgroups. Within sets the limits. Between is what you're hunting.

Bad: five slats from the end of shift bin. They come from different hours, so the within subgroup spread includes the very changes you want to catch. The limits come out wide, and the chart goes blind. Good: five slats in a row, every hour. Bad: one subgroup that mixes two machines, heads or cavities. Good: one chart per stream. Four or five units is a typical size, and sample often enough to catch a change before it costs much.

Worked example 3: the tube saw

Worked example two: the bender. It bends a pair of Harbor chair back legs on every stroke, with a left head and a right head. Target: one hundred five degrees, plus or minus one. Nate's subgroup: two strokes in a row, four legs, left and right mixed. Twenty subgroups give an X double bar of one hundred five point oh, and an R bar of point six five degree. With A two of point seven two nine for subgroups of four, the limits are one hundred five, plus or minus point four seven. So zone C is about plus or minus point one six.

And all twenty averages sit inside zone C. Fifteen in a row inside zone C! Not a perfect process: a broken subgroup. Every average holds two left legs and two right legs, so the difference between the heads cancels out in the average, but it inflates every range. Split by head, the story is clear. Left head: centered near one hundred four point eight. Right head: near one hundred five point two. Each has an R bar near point four, and limits about plus or minus point three around its own center.

How to read the result and decide

Both heads are in spec today, but on the mixed chart a drifting head would hide in those wide limits. Lou resets the right head's angle stop, and Nate now keeps one chart per head, four legs in a row from the same head. Same machine, new subgroups, and suddenly the chart can see!

Common mistakes

Now short run S P C. Kofi's tube saw cuts Harbor chair legs at four hundred fifty millimeters, Ridge bench legs at four hundred twenty, and Harbor table legs at seven hundred ten, in short batches. A chart per part would take weeks to reach twenty subgroups. The fix: chart the process, not the part.

Recap

The tool is the deviation from nominal chart. For every piece, plot its measurement minus that part's nominal. A four hundred fifty point oh three chair leg plots as plus point oh three. A seven hundred nine point nine six table leg plots as minus point oh four. Now every batch lands on one chart. It works when the parts share the same process and about the same spread, and nominal is the target. Check that first!

Check yourself

When the spreads differ, use a standardized chart. Z equals the measurement minus the part's target, divided by that part's own sigma. The limits are plus and minus three, and the zone rules work as usual. Take a deviation of plus point one eight millimeter. On a part with a sigma of point oh six, that's a Z of three, right at the limit. With a sigma of point one two, it's only one point five.

Worked example three. Marcus checks that the three legs have about the same spread: standard deviations of about point oh four to point oh five millimeter. Good. Kofi measures one leg from the middle of every batch on the saw's digital gauge, which already reads the deviation from its setting master. Sixteen batches average about plus point oh one, with a moving range bar of point oh seven five. The limits are the average, plus or minus two point six six times point oh seven five: about minus point one nine to plus point two one millimeter. The moving range limit is about point two five.

Batch nineteen is Harbor table legs, and its middle leg reads plus point three one. Above the upper limit of point two one, with a moving range of point three four, above point two five. Signal! Still inside the half millimeter tolerance, but special. After the changeover, the stop's lock lever wasn't fully tightened, and the stop crept. Kofi adds lock and tug to the changeover checklist. On a chart of table legs alone, that batch would have been the only point. No chart at all!

One more short run tool: pre control. It's not a control chart. It uses the specification. For a leg of four fifty, plus or minus point five, the middle half of the tolerance is green. The outer quarters are yellow, and outside the spec is red. Start with five greens in a row. Then check two pieces now and then. Two yellows on the same side: adjust. On opposite sides: stop and find out why. Any red: stop. Simple, but it only works well when capability is already good.

So how do you read the result and decide? Note which rule fired. One point beyond three sigma points to a sudden change. Runs and four of five point to a small shift. Trends point to wear. Hugging and mixtures point to your subgroups, not your process. Find the cause, fix it, and note it on the chart. And control limits are not specification limits. A signal while every part is in spec is the cheapest time to act!

Common mistakes. One: every rule turned on, then chasing false alarms. Two: celebrating a chart that hugs the center line. Three: subgroups that mix machines, heads or shifts. Four: subgroups spread across a whole shift. Five: a deviation from nominal chart for parts with very different spreads. Six: treating pre control as a control chart.

Let's recap. Zones: C within one sigma, B from one to two, A from two to three. The four zone rules: one beyond three, two of three beyond two, four of five beyond one, eight in a row on one side. More rules, more false alarms: about one in three seventy points for rule one, about one in ninety for all four. Rational subgroups: within is common cause, between is where signals show. Short runs: chart deviation from nominal, or standardize!

Now, check yourself. Lou's oven temperature is on an individuals chart: center line four hundred point oh degrees, upper limit four hundred six point four. The last three mornings read four hundred four point nine, four hundred one point two, and four hundred four point six. Which rule fires? A, none. Every point is inside the limits. B, rule one. C, rule two, two of three beyond two sigma. Or D, rule four. Pause the video if you want to think about it.

The answer is C. One sigma is six point four divided by three: about two point one three. So the two sigma line is four hundred four point two seven. Four hundred four point nine and four hundred four point six are both above it, on the same side, within three points. Rule two fires! A forgets that a chart can signal inside its limits. B needs a point beyond four hundred six point four. D needs eight in a row.

That's run rules, rational subgroups and short run S P C. Questions? Ask Q-Bot right here in the Academy. And one for the road: why did the bender chart hug the center line? It was trying to keep its two heads together!

Independent study material; not affiliated with or endorsed by ASQ. Body of Knowledge codes identify where the topic appears in each certification's published outline.